We start with your design. Modular is how we build it, not what you settle for.

Shape Homes modular residence at dusk, charcoal cedar and warm-lit glass

Custom homes and ADUs, built on the lot you already own

More custom than a prefab.
More predictable than a contractor.

Your price is set at signing.
Your shell goes up in a week.

Your walls, floors and roof are cut and assembled in a Northern California shop while a crew pours your foundation. They arrive flat on an ordinary flatbed and go up in about a week, no crane and no road closure. You can still move a wall in month four.

  • Price fixed at signing
  • A set date in writing
  • Your project manager never changes

The plans

Over 200 plans in the library, from a 400 square foot studio to a 4,000 square foot house. Nine are below.

Start from the library

Over 200 plans, drawn, engineered and priced, from studios to 4,000 square foot houses.

  • Priced before you call
  • Change the plan, elevation or finishes
  • Fastest route through your city's counter

Or start from your own design

An architect's set, a Pinterest board, a sketch on an envelope.

  • Your architect stays on the job
  • Every choice priced before you commit
  • No module size, so nothing shrinks to fit

Ranges are all in: factory package, delivery, foundation, utilities, permits and site work. What moves a project inside its range is the lot, not the house.

Owners in the doorway of their finished backyard ADU
Our son was coming home from college in June, and we wanted the guest house done before he landed. Shape wrote the finish date into the contract. We got the keys three weeks early.

Sarah, Los Altos

See how the design step works
Completed white oak street elevation at golden hour

Four ways people use the lot they already own

The common version. A detached unit on its own foundation, four feet off the side and rear lines. Rent it, put a parent in it, or stop taking calls from the kitchen table.

Up to 1,200 sq ft60-day decisionNo impact fees under 750
See the ADU plans

Your garage is worth more with a unit on top of it. We set a new two-car garage with a one-bedroom above, on the pad the old one sat on, and you keep the parking you already had.

Keeps the parkingBuilt for narrow lotsSame footprint
See The Mews

Take down what is there and build a new house at the same address. Demolition, foundation and utilities all happen while your house is on the factory floor, so your lot is a construction site for a fraction of the time a site build takes.

You hold titleAbout 4 months on sitePrice fixed at signing
See how it works

One permit set, one crew, two buildings. Our honest advice: if you are going to build the ADU eventually, build it now. Coming back in four years costs more than the unit is worth in rent over that time.

One mobilizationTwo buildingsSaves about 11 weeks
Price both together

How we got here

Finished kitchen with a marble waterfall island in a completed Shape home

What you actually get

Slab counters, real millwork and steel windows, in 750 square feet or 3,900.

Read the spec
Board-formed concrete meeting a black steel window and a white oak reveal

Built to the same code

State approved under California's factory-built housing program, inspected in the shop.

How approval works
A delivered two-story home at dusk with a lit entry

Delivered projects

Every house and ADU we have finished, with the schedule we actually ran on it.

View past projects
Rear terrace with pool, outdoor dining and a linear fireplace at golden hour

Built indoors. Measured by machine.

On a normal job site, walls are cut and framed outdoors by hand - in rain, on uneven ground. Ours are cut by machine to the exact drawing, inside our shop. That's why our walls are square, our doors close right, and our completion dates hold.

Talk to us

Your walls exist before we break ground

Two things run at the same time, and that is the whole trick. The city is still the long pole, just a shorter one when the components are already state approved.

01Lot check

Before you pay us anything we find out what your lot will take. The part almost nobody checks first is whether a flatbed can get in and where we can stack panels, and roughly one lot in seven fails on access alone.

  • Parcel, zoning and your city's ADU ordinance
  • Truck access and a staging spot for the panel stacks
  • Sewer lateral, water meter and electrical panel capacity
  • Soils screening, drainage and protected trees
  • What fits, and what it costs on your lot specifically
02Design

We start with what you want the house to be, then work out how to build it in components. You are not designing around a box, because there is no box.

  • Start from one of 200+ library plans, or from your own drawings
  • Your architect stays on the job if you have one
  • Every change priced before you commit to it, not after
  • Site plan drawn on your actual parcel
  • Fixed price and a fixed completion date in the agreement
03Approvals, on two tracks

The components are approved by the state and your lot is approved by your city, at the same time. On a complete ADU application the city owes you a decision in 60 days. Some miss it, and we write that letter.

  • HCD component approval and insignia, third-party shop inspection
  • City review of foundation, siting, drainage and utilities
  • Title 24 energy compliance and CalGreen
  • School fees, will-serve letters, encroachment permit
  • Neighbor notice where your city still requires it
04Shop and site, at the same time

Your panels get cut from the model and assembled on jigs while a crew pours and trenches on your lot. Two tracks, one schedule, and that overlap is most of the reason this finishes so far ahead of the same ADU built on site.

  • Cut from the model, so what is drawn is what is built
  • Third-party inspector signs off before a panel is closed
  • Demolition, engineered foundation and utility stub-ups in parallel
  • Panel upgrade if the load calculation calls for one
  • Photo set every Friday, and you are welcome to walk the shop floor
05Shell up

Panels come off an ordinary flatbed in the order they go up, and a small crew stands them, bolts them down and dries the building in. A week from bare slab to weathertight, with no crane and nothing closing your street.

  • Standard flatbed delivery, panels stacked in erection order
  • Four to six people and a telehandler, not a crane crew
  • Bolted and strapped to the foundation, inspected as it goes
  • Dried in and weathertight inside the week
06Finish on site, then handover

Rough mechanical, electrical and plumbing, then insulation, drywall, cabinets, tile, floors and paint. This is the longest stretch on your lot and the reason you can still make decisions in month five.

  • MEP rough, insulation, drywall and finish carpentry
  • Cabinets, tile, floors and paint, all specified in design
  • Blower door test and commissioning, report handed to you
  • Internal punch, then two owner walks
  • City final, as-builts, digital home manual, warranty start

See the full process

Great room and kitchen with white oak millwork and a marble island
The price is fixed at signing and draws follow the contract schedule, so the only change orders are the ones you ask for.

PriceFixed at signing, itemized by category

See more projects

Green here means the air inside it

Everyone points at the solar panels. What actually changes how a house feels to live in is what it is made of, and what those materials keep giving off for the next ten years. Twelve decisions are standard on every plan. Four of them:

Insulation

ROCKWOOL Safe, sheep wool or dense-pack cellulose. No added formaldehyde, anywhere.

Air

Balanced ERV on MERV-13 or better. 300 CFM hood ducted out. Bath fans exhaust straight to the outdoors.

Proof

VOC testing before you move in, moisture mapping in the wet areas, cut sheets on every product.

Floors

FSC-certified wood with water-based finishes. No vinyl and no PVC, anywhere in the house.

Read our full green building standard

From the journal

Plan set, cost estimate and calculator on a job-site table

Cost · 8 min read

What a modular ADU actually costs in the Bay Area in 2026

What comes standard

The shop buys you precision and a schedule. Your lot is where the house becomes yours. Four lines from the full specification:

Windows
Fleetwood or Marvin Ultimate as base. Thermally broken steel where the design asks for it. No vinyl anywhere in the house, including the garage.
Structure
Engineered per lot, with seismic detailing past code. Every connection modeled before it's cut.
Envelope
Taped sheathing, a drained rainscreen and a blower door test before handover. Built for forty years of Bay Area weather.
Warranty
One year on everything, two on mechanical, electrical and plumbing, ten on structure. We come back at month eleven whether you called or not.

Read the full spec

Aerial view of a leafy Northern California residential neighborhood

What we've built so far.

Buildings finished, cities delivered to, and the share of jobs that hit the completion date we put in the agreement. Ask for the list and we send it unedited.

0Homes and ADUs delivered
0Bay Area cities delivered to
0Plans in the library
0Finished on or ahead of contract date

Start with the address.

Bring the address, and your drawings if you have them. We pull the parcel, your city's ADU ordinance and a street view before the call. Twenty minutes in, you'll know what fits, which plans suit the lot, and a price range you can plan around. No obligation, no sales sequence afterwards.

Price fixed at signingDraws follow the contract schedule
Schedule in the contractA completion date you can hold us to
Ten Bay Area townsPlus the nine counties around them
Component builtFinished in the shop, assembled dry on your lot

Book a free consultation